Office Furniture Services

Service Overview
We provide professional office furniture solutions including:

  • Workstation installation
  • Ergonomic setup consultations
  • Modular furniture configuration
  • Office layout planning

Installation Services
Our certified technicians will:

  • Assemble all office furniture components
  • Install height-adjustable desks
  • Configure modular systems
  • Ensure proper electrical connections (for powered units)
  • Perform safety inspections

Planning & Consultation
Additional services available:

  1. Space planning (digital layouts)
  2. Product recommendations
  3. ADA compliance reviews
  4. Post-installation adjustments

Service Process

  1. Request Quote – Online form or phone
  2. Schedule – Next business day available
  3. Installation – 4-hour arrival window
  4. Inspection – Quality assurance check

Pricing Structure

  • Standard installation: $99 first item + $49 each additional
  • Complex systems (cubicles/conference rooms): Custom quote
  • After-hours service: +40% fee
  • Emergency same-day: +75% fee (limited availability)

Customer Requirements
Prior to service:
✓ Clear workspace (minimum 8×8 ft area)
✓ Provide electrical access
✓ Designate decision-maker onsite
✓ Secure sensitive documents

Warranty & Guarantees

  • 1-year labor warranty
  • 30-day follow-up adjustment period
  • Damage protection during installation

Service Limitations
We cannot:

  • Modify structural elements
  • Lift items over 200 lbs without equipment
  • Provide electrical work requiring licensed electrician
  • Dispose of old furniture (available as add-on)

FAQ

Q: What tools do technicians bring?
A: Full complement including laser levels, power tools, and safety equipment.

Q: Can we schedule for weekends?
A: Yes – Saturday appointments available at premium rate.

Q: How long does a 10-workstation install take?
A: Typically 4-6 hours with two technicians.

Q: Do you disassemble existing furniture?
A: Yes – $35/item fee applies.

Q: What COVID precautions are taken?
A: Masks, gloves, and disinfecting protocols followed per local guidelines.

Plan Ahead Tip: For large installations (>20 workstations), we recommend scheduling 2 weeks in advance for optimal availability.